This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes mechanical removal and disposition of ancillary eq…
SRSCRO will remove the excessed drill press at 784-1A.…
Development of ionic liquids will be investigated in 999-2W. Major activities include synthesis of ionic liquids (IL) with varying cation and anion…
This project will be evaluating various vacuum pumps for possible use in the SRS Tritium Facility.…
Vibromet polishing machine will be used for final, high-quality polishing of R and D samples.…
An advanced protocol security oven will be modified and used to simulate an industrial process for research and development purposes. The oven will…
This EEC covers the use of the non-rad pyroprocessing system. The pyroprocessing operations to be tested on this system are molten salt extraction …
Subcontractor will provide roof repairs at 704-7B and 704-12B. The Subcontractor will not disturb the existing roof while performing these repairs …
Adding down-line electronic reclosers on distribution power line wood poles and replacing reclosers in existing substations.…
K-Area Plutonium Down-Blend Processing Enhancements: Leaded Glass Shielding…