Construction will remove asbestos insulation in support of maintenance activities.…
Replace Flooring at 709-1G and 709-7G.…
Replacement of Duct Detectors in 704-C, 705-C and 705-1C.…
730-B and 730-1B Replace automatic entry doors.…
Adjustments to the Saltstone Process flushing sequence.…
The dust collector (Z-205000-BMH-DCOL-0002) for Silo No. 4 is to be replaced.…
Soil gas samples will be sampled using a soil gas probe and analyzed for the possible presence of radon.…
CM 4422 TS/Repair electric heater No. 1 at 717-10N.…
The 14C pump has degraded. The concrete which fills in the metal frame of the pump base has eroded away via acid intrusion and is leaking from 3rd …