There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in th…
Six single-wide trailers will be removed and replaced with three new double-wide trailers near gate 16. Three of the single-wides will be relocated…
The Process Technology Programs (PTP) will conduct laboratory scale simulations of the Defense Waste Processing Facility (DWPF) process at the Aike…
This EEC covers various general renovations for Building 786-A, such as flooring/cove base replacement, door replacement, ceiling tile replacement/…
This activity is an evaluation method that encompasses the use of NIST traceable viscosity standards consisting of a mixture of mineral oil and mix…
Minor renovations will take place in the SREL "brooder house" animal holding facility.…
Removal of old Compressor tank and installation of new one.…
Remove disconnected legacy electrical components on a small pad south of 190-K.…
Small sections of sidewalks to be repaired in K-Area.…
Evaluate and correct water damaged tiles in 221-H, section 9 personnel tunnel.…