Sheetrock repair in HBL rooms 270, 287, 603, and 611.…
The general services H-Canyon New Warm Crane (NWC) Radio Frequency system and equipment have become problematic and obsolete. While operating the N…
Implementing a design change (M-DCP-H-18024) to replace the existing process air compressor piping.…
Remove seven vertical power strips and install quad box receptacles at 760-1G Room 13.…
The proposed activity is to evaluate the stairs at the entrance to Building 703-14F. The necessary repairs will be performed as determined by the e…
Disposal of wastewater containing low concentrations of ethylene glycol to Central Sanitary Waste Treatment Facility.…
Repair drainage and sidewalk in front of 722-A and 784-7A.…
The 50 Ohm resistance thermal device (RTD) for 8.4 will be replaced with a 100 Ohm Platinum (PT) RTD. The associated recorder shall be reprogramed …
Repair Drainage in Parking Lot South of 704-60E .…
Removal of LANA material from PS Hydride Beds A and D.…