Routine maintenance activities and custodial services for SRPPF Complex Area buildings, structures, rights-of-way, infrastructures, during which op…
Relocate Rosemount Glovebox Oxygen Monitor LL6 pump plate.…
SRTE perimeter upgrades will involve: Aircraft Cable Refurbishment and Upgrades, placement of new jersey barriers. Placement of jersey barriers wi…
Install new 1 inch rigid galvanized steel (RGS) conduit and conductors to fans VVS-FAN-1 and 2 at 776-1A and 776-4A.…
This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
The Kaplan and Lin lab are conducting rad and non-rad studies to investigate cement leachate impact factors for sediments.…
In order to protect the integrity of the Deionized Water Basin, over pressurization needs to be avoided. A pressure relief valve is accordingly bei…
Evacuating Air Handler Units 600, 700 and 800 in the 105-L Disassembly Area. These have been removed from service.…
D and R of K-Area Purification Steam Supply Line…
Filter replacement will be performed in front of inner roll-up door in the Truckwell Airlock.…