Isolate and remove 704-Z clean air handling units.…
Isolation and removal of HAAS TL-3 CNC Lathe (DOE 011809) from building 226-2F to building 717-F machine shop. Preparation includes, but is not lim…
Contractor has evaluated a termite infestation problem at Building 735-B and will provide treatment per G-SOW-B-00304.…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Provide labor, materials, services, and supervision to recoat the interior and exterior of the 902-6G fire water storage tank in accordance with th…
Floor tile will be replaced at 702-S.…
Routine electrical and mechanical fabrication, assembly, testing, installation, operation, and maintenance activities performed by R and D Engineer…
Hands-on" fabrication activities covering the assembly of equipment and systems designed by the Energy Security and Engineering Department for SRNS…
Small radioactive particles will be deposited on planchets using aerosolization. These particles will be used as reference standards for various an…
Testing of simulants with dead-end filters under different conditions in order to characterize the precipitates and examine the impact of upstream …