Lab C-059 needs a new T-branch and piping to supply an argon connection point to a hood.…
K-Area CCO Storage Pad Wire Guidance Tracking System Modification.…
Replace all floor tiles at 702-1C per Acknowledgement of Scope.…
SRS has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Fre…
This project is specific to the implementation of a Record of Decision (ROD) for three FFA subunits that are located within the N Area boundary: Ea…
Salt simulants and cementitious waste forms will be made at EDL for testing up and including to 55-gallons.…
Purify solutions of dissolved actinides using ion exchange, valence adjustment, precipitation, filtration, and calcination.…
An underground leak in the Cooling Water System (CSW) piping has been detected. A temporary CSW feed to Melter Cooling Water (MCW) is needed during…
Replace glovebox oxygen alarm panel annunciator in Control Room of Building 264-H.…
CX-030718: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM.…