The two outside Diesel Fuel Storage Tanks on the south side of 735-1B need to be repainted.…
Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…
Flow sensors are planned for installation at two locations in Steel Creek near P Area.…
Flow sensors are planned for installation at two locations in Pen Branch near CMP Pits.…
Twelve shallow groundwater wells are planned for installation within Pen Branch, north of the CMP Pits Operable Unit, to aid in further groundwater…
This project will evaluate various vacuum pumping technologies for possible use in tritium process systems.…
The modification of TEF systems to install Mini-TCAP isotope separation is explained in MT-TRI-2019-00010 Revision 0.…
Beavers have constructed lodges in the stormwater pond above Outfall N-15 and need to be relocated.…
Bury 2-miles of aerial single phase electrical line feeding the Kings Mountain State Park in existing right-of-way.…
Bury 3-miles of aerial three phase line feeding the Kings Mountain Nat'l Military and State Parks in existing right-of-way. Single-phase line feed…