Refresh Walk Path at 730-B, 730-1B, 730-2B, 730-4B Sidewalk/Walkway repair/restriping.…
Unit Price Construction (UPC) Contractor shall provide all equipment, material, labor, and supervision to demolish and relocate 19 Handi-houses fro…
Study the behavior of materials of interest under induction heating, including the effect of adding nanoparticles, microparticles and macroparticle…
Development and Testing of Electrochemical Denitration Systems…
Replace 291-S Zone 1 Exhaust Stack continuous air monitoring systems by: 1. Replace hotwire anemometer sensors with a pitot tube array, 2. Replace…
Use of Energy dispersive Amptek x-ray fluorescence instruments to analyze both liquid and solid samples.…
Inert glovebox operations in 786-A to support R and D in which air sensitive material will be handled. This EEC captures only the operations around…
The Bettersize S3 Plus Particle Image and Size Analyzer will be installed in 999-2W lab 154 in order to provide particle size and shape analysis fo…
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
Paint piping at 905-100F.…