The purpose of this work is to better understand the proposed flowsheet for the discard of contaminated bulk graphite materials. …
Scope for instructions tab for all 3 tasks: Pressure switch for Fuel Pump 619-4N malfunctioned causing fuel oil to leak in the shop area at 717-3N.…
Centerra-SRS personnel would like to test fire ESS weapons in B-area prior to each Force-on-Force (FOF). Canine(K-9) Department desire to perform K…
713-2N Repair damaged high-bay building insulation that is torn.…
Paint exterior of spare 18" river water globe valve.…
Painting without stripping/sanding/scraping in L Area Complex.…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Video Teleconferencing equipment will be relocated between various SRPPF buildings to support transition of building ownership.…
This activity involves heating already-prepared metal samples in a furnace (still solid), placing them into a mold, and mechanically shaping them i…
GTSTG uses the Environmental chamber (EC) in 723-A for Function testing as requested by the DA's and for unloading as requested by SRTE.…