The project will consist of installing new underground electric lines, at a depth of 48" and appurtenances and lighting in a 10-foot easement acqui…
Existing Electrical Distribution System Improvements.…
Replace front entry door and cypher lock at 785-6A.…
This EEC covers renovations in offices in 704-1N.…
Deployment of a temporary frac tank system to replace the failing septic system, so that a plan to move forward can be formulated while the septic …
Establish Digital Density meter analytical capability in 735-A, D-wing. Perform density analysis of water samples, saltwater samples and dilute D-w…
Removal of wood bridge from 294-1F.…
The metal siding on the corner of the trailer (Building 773-65A) is loose due to storm damage and will be repaired.…
Installation of two new Quad wide trailers (707-69B, 707-72B) and utilities and two Double-Wide restroom trailers and utilities (707-76B and 707-77…
TS/Repair Fuel Oil Heaters at Building 711-N.…