Exchange Classified TEF D/3 DCS equipment to Classified TEF Delta V DCS.…
Mold will be removed from SRPPF Warehouse tent building 263-242F in the SRPPF complex using Simple Green and a pressure washer.…
NNSA-N-2024-00001 Revision 0: With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) …
Analysis of microbial and eukaryotic cells after exposure to environmentally relevant PFAS compounds.…
Rad samples are analyzed on the Rad Microtrac S3500 Particle Size Analyzer located in 773-A C-150. Non-Rad samples are analyzed on the Microtrac S3…
This EEC covers special methods for the Radchem Group's postdoc projects, LDRD, nonroutine chemicals, etc.…
Subcontractor will provide roof repairs at 705-A.…
The damper, flex duct, and associated gaskets on A-735000-CHEX-FAN-D3 are being replaced.…
Upon installation of the new HiPace 300 Turbo Pump in the Gas Blend System per M-DCP-H-18004, the inlet flanges were damaged which prevents a tight…
The 701-3H water heater is obsolete and needs to be replaced.…