Fabricate and install a new sprinkler pipe stand at 315-M.…
704-1N Installation of 5 RFID (Radio Frequency Identification) portals in the PCA (Personal Computer Administration) warehouse.…
Startrite Clausing Band Saw located in the Boilermaker's shop 717-1N, will be disconnected and excessed to the SRSCRO.…
731-1N Repairs in Restroom/Janitorial closet.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer and Ultivo triple quadrupole mass spectrometer in buildng 735-A,…
This EEC references an analytical method for density measurements using either a densitometer or an analytical balance.…
The filtration rate at the Salt Waste Processing Facility (SWPF) has been significantly less than the design target. Savannah River Mission Complet…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…
Purify solutions of dissolved actinides using ion exchange, valence adjustment, precipitation, filtration, and calcination.…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…