The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement. …
This EEC covers various basic repairs and maintenance activities for Building 999-3W, such as flooring/cove base (trim) replacement, ceiling tile r…
Proposed Activity will add penetrations to the Saltstone Hopper Overflow Container (SHOC) to allow better and safer operations.…
Installation of Wi-Fi in 717-5N.…
Install UW Drops in New Cubes in 704-1N Rm. 177.…
The Forestry Service constructs hog barrier fences around Area Completion Projects Operable Units as a cost-saving maintenance activity.…
The Forestry Service constructs hog barrier fences around Area Completion Projects Operable Units as a cost-saving maintenance activity.…
The Forestry Service constructs hog barrier fences around Area Completion Projects Operable Units as a cost-saving maintenance activity.…
The Steam Supply System provides steam to the Defense Waste Processing Facility (DWPF) buildings located in the S Area. High pressure steam at 260 …
The breathing air compressor is original to the Defense Waste Processing Facility (DWPF) and was installed in the 1980's it needs to be replaced.…