The 50-ohm resistance thermal device (RTD) for 15.3 will be replaced with a 100-ohm Platinum (Pt) RTD. The control system shall be reprogrammed to …
Configuration Changes Necessary for safe Operation of the Chemical Injection System Which Injects CL4132 to the Service Water Header.…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Building 707-1F is in need of minor repairs/renovations prior to housing personnel in office spaces.…
Installation of industrial curtains in order to prevent the nesting of barn swallows at 292-2F.…
701-20G Correct Water Line Mounting at Barricade 1 per AOS (Acknowledgement of Scope).…
Maintenance will replace the 704 condenser which has been deemed inoperable due to normal wear and tear.…
Scope of work is being revised to include re-lamping in all of K Area.…
Placement of cellular telephone locker on concrete pad across from Entry Control Facility-3, K-Area.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…