This EEC covers the implementation via P-DCP-H-18001 for the relocation of part of the 234-H Finishing Line process to 233-H. Functions and capabil…
This work scope at 704-30G trailer is to replace the North door. The completion of this work scope will include the working with Asbestos Containin…
The 2-inch Readco Mixer will be operated in EDL combining premix material with salt solution in order to create a grout waste form.…
This R and D activity will investigate the effects of various processing conditions on the synthesis of catalyst materials. Isotope exchange effici…
This EEC is for the operation of a Tabletop SEM to investigate dry solids through imaging and elemental analysis.…
Operations and the Non-Destructive Examination team will insert a temporary camera into H Sump associated with 776-1A to monitor water intrusion.…
The scope of work will include general renovation in 776-2A as deemed necessary by the customer.…
The proposed work activity is to remove the 294-2F gutter and evaluate any needed repairs due to storm damage. Following the evaluation, any necess…
Rev 0 covered the upgrade of glovebox oxygen monitoring system with a Delta F analyzer and a Delta F oxygen sensor. Rev. 1 expands the cope to incl…
Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…