Pump Out Waterjet Tank in 773-50A.…
Relocate and demolish trailers 719-1N and 719-4N (Revision 2).…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of Par Pond Dam. Eleven (1…
The TEF Platform Mounted Robotic Arms (PMRA) are from 2003 and upgrade modifications are necessary for continued operation. The Proposed Activity i…
Upgrade Universal Wiring to CAT 5e in 731-1N.…
Replace submersible pump with two Gould 3171 ST vertical Sump Pumps Size: 1.5x3-6/5V.…
The Breathing Air filters that are in the H-Canyon Warm Gang Valve Corridor no longer have filter elements available commercially. The filter housi…
This EEC is part of the F/H Laboratory (FHL), 773-A Laboratory Modification Project. This activity covers the preparation of radioactive standards …
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
Railroad Crossing Replacement at Road F and Main Line (Hillman Siding/Signal 07) and Road 6 and Main Line (Signal 11).…