The scope of this work order is to implement C-DCF-H-04726. Construction is to replace the drip pan tubing in building 234-H Room 22 with PVC pipin…
The Concept Laser Mlab 200R additive manufacturing machine produces complex metal parts from 3D computer aided design (CAD) models via laser beam m…
Since 1999, the Nonproliferation Technologies Section (NTS) has established and maintained inorganic mass spectrometry laboratories for the analyse…
The proposed work scope includes corrective maintenance activities to repair the equipment associated with the 285-3/4F chiller.…
Subcontractor will perform a roof replacement on 702-D. The Subcontractor will disturb the existing roof on 702-D.…
Subcontractor will provide roof repairs to stop leaks at 735-4B.…
A research project focused on the effects of vegetation distribution on fire behavior and smoke plume development. In one 1-hectare plot, researche…
Subcontractor will perform a roof replacement on 192-2K. The Subcontractor will disturb the existing roof on 192-2K.…
Install plug in sewer manhole to isolate 284-H from the sanitary sewer system.…
Modification of Test Console Vent Piping in 221-33F.…