The subcontractor, Queen City Railroad Construction, shall replace wooden line ties from the railroad bed, identified by site transportation and en…
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
The Chemical Process Cell (CPC) Purge Air Receiver is too small for the flowrate needed by the CPC vessels.…
The failed roofing system on the 704-L roof will be demolished and replaced. This will prevent numerous leaks that currently plague the building.…
Filters will be replaced, units will be DOP tested and ventilation tested.…
Replace a door at building 701-3G (Barnwell Barricade).…
The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
703-46A Install 1 UW Drop in Room 266.…
702-A Install Keri door on entry No. 4.…
The proposed activity will cover the connection, operation, and disconnection of air sampling systems in 773-A E-023 for effluent monitoring and ch…