This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
The Chemical Process Cell (CPC) Purge Air Receiver is too small for the flowrate needed by the CPC vessels.…
The failed roofing system on the 704-L roof will be demolished and replaced. This will prevent numerous leaks that currently plague the building.…
Filters will be replaced, units will be DOP tested and ventilation tested.…
Replace a door at building 701-3G (Barnwell Barricade).…
The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
703-46A Install 1 UW Drop in Room 266.…
702-A Install Keri door on entry No. 4.…
The proposed activity will cover the connection, operation, and disconnection of air sampling systems in 773-A E-023 for effluent monitoring and ch…
Create Ingots containing uranium and/or thorium alloyed with stainless steel with small amounts of yttrium oxide created in D-0142 under the Enviro…