Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Temporary Modification to provide an alternate power source to Motor Control Center (MCC) B907 from B202-2E during B9 outage.…
Mosquitos collected as larvae from SRS will be used on various behavior experiments. Research projects will focus on the looking at the behavior of…
Remodel 713-N Room 7and new HVAC Installation for Building 713-N Room 7…
FBI evidence examination and handling training using F-18, La-140, or Au-198.…
An abandoned piece of conduit will be removed and disposed of as LLW.…
SRNL will evaluate natural attenuation success for the CMP Pits perchloroethylene plume fringe at Savannah River Site through microbial molecular b…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
FAC-10C, BG14 and FAB1 are three (3) monitoring wells that are no longer sampled for regulatory groundwater monitoring and are within the footprint…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…