Remodel 713-N Room 7.…
Vendor will install bottle filling water stations near the kitchens on the second and third floors of 730-4B.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Rev. 0: Site construction will be replacing the bolts on catwalk/ladder and painting the M-1 Air Stripper and associated components as well as the …
T3 transformer in the L reactor area is being replaced. EP number is 105L-573.3. CLI number is L-105000-NEP-SWGR-T3-XFMR-3.…
The U.S. Department of Energy (DOE) is proposing to provide funding to Clemson University to expand the Clemson BikeShare network. Under this proje…
General operation and maintenance of the Laser Flash Apparatus in the Hydrogen Technology Research Laboratory.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
Cut valve internals out and replace, welding and grinding is required.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters.…