Installation of new metal building in the former location of 773-69A and 773-70A.…
Remove Remaining Items in 730-N.…
Install electrical components, conduit, and run cable from 711-6N to 711-9N per TOA-22EMS-10-067 for communications subcontractor to terminate and …
Replace the existing Cold Feed Chemical Systems Caustic Transfer Pump (422-010-031-00-P), system NAK with a state-of-the-art transfer pump since th…
Move existing air station off of private property to onsite location. Install power at pole: R22 1344G, and move air station from existing site to …
The EEC covers refurbishing aboveground fuel tanks 619-2N, 619-4N and 715-3N.…
Install Sample Tap Modifications to 782-A Service Water Header.…
Correct Drainage Issues at 719-5N.…
Terminal Engineering and Manufacturing (TEM), was selected to design an almost like-for-like diffuser to replace the old JMIs diffusers during fail…
It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…