Subcontractor will provide a roof replacement at 730-B.…
The EEC covers the renovations to the interior of building 717-8N.…
Move the 681-3G transformers without oil to 681-1G (retired) pumphouse for ultimate disposition by the CRO. The 681-1G transformers are currently s…
Ligands developed at the University of New Mexico will be shipped to SRNL to test their efficacy at sequestering pertechnetate from aqueous solutio…
705-C Habitability repairs.…
This EEC will cover the repair of the underground M-1 Air Stripper header per Work order 01992928.…
607-70G: Remove grout from boat clarifier inside oxidation ditch No. 1.…
Remove and replace electrical air compressor from building 717-1N…
Run copper cable from 719-5N to 704-199N.…
Weapon Production Technology (WPT) group is replacing the legacy inert gas purification system from Vacuum Atmospheres Company (VAC) in Lab C-061 p…