Remove existing carpet tiles, floor tiles and mastic beneath carpet in room 216 and 36 in 234-H. Place new mastic and carpet in both rooms.…
Construction Craft to paint office areas in 248-H. Prior to painting, they will repair damaged wall surfaces by filling and sanding them smooth. Vi…
Assess and replace 234-H roof drain piping as applicable.…
Replace 233-H ELU-1 and ELU-5 lights with Light Emitting Diodes (LEDs) per E-DCF-H-09681…
Cranes are being excessed via established SRS protocol.…
This scope modifies 221-33F to reduce sound related hazards and to increase control of the discharge air from the relief valves.…
This research and development activity will evaluate hydrogen diffusers in support of Tritium facilities at the Savannah River Site.…
Proposed activity will cover the various Temporary Modifications associated with the B4 Outage. Load Center (LC) B4 will be de-energized to perform…
This EEC covers various general renovation activities for Building 773-41A. Scope includes D and R such as replacing sink, associated piping and el…
This EEC covers various general renovation activities for Building 773-42A. Scope includes D and R such as replacing sink, associated piping and el…