Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
Remove existing air station off of private property and install a new air station at the old Williston barricade.…
An electrical resistance tomography (ERT) system (a geophysical method) will be tested on the low permeability geosynthetic cap over the closed Tre…
Installation of two new double-wide trailers in N-Area.…
Replace 731-N HVAC with a new system.…
Prepare and paint 10-foot metal building walls with a 10-foot parapet wall above the roofline.…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 233-H Tritium Air Monitoring system.…
The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced.…
This EEC covers various routine maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…
A new receptacle is needed in Room 144 per the life and safety group.…