Remove abandoned bioassay equipment located in 735-A, C-Wing (WO
Replace light fixtures with LEDs at 711-N, 711-9N, 717-10N. Replace 1 electrical wall heater in 711-9N and 5 electrical wall heaters in 717-10N.…
Install new awning on trailer 704-24G.…
This activity is to replace the Motor Generator (MG) sets in 151-1C and 151-2C due to end of life state of the equipment.…
This EEC is intended to cover field research performed by Dean Fletcher, SREL researcher, for various projects all related to the investigation of …
Repair window pane in 105-K Women's Change Room.…
Selected vendor will recycle both lead and lead acid batteries used at SRS. Vendor will pay SRS in accordance with the attached Sales Agreement.…
Defense Waste Processing Facility (DWPF) operators are having trouble viewing DWPF Glass Canister Serial Numbers when placed in the Glass Waste Sto…
This activity involves refurbishments/repairs to domestic water monitoring equipment and waterproofing improvements for domestic water pits across …
Sealand Container will be used as a storage facility in Z-Area, and thus, it requires electrical power and necessary cooling capability, to meet B-…