Due to normal age and wear, five steam poles have been identified for replacement. Parts are direct replacements. Steam poles will be replaced util…
766-H Building renovations.…
Chilled Water Pump Replacement K-Area.…
Air gap 285-H steam turbine exhaust feed to 284-H.…
This EEC covers the trouble shooting and repair of Welding Exhaust Fan No. 2 at 717-3N.…
Install 2 CNC Machines for Advanced Engineering Group, Bldg 723-A, Room 161: (1) Install HAAS ST-20 CNC lathe and provide power and compressed air …
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self-contained low powe…
Modify Plant Airline and install equipment in 717-F machine shop…
BSRA proposes to construct and operate a Non-Radiological Laboratory Center in A Area at the Savannah River Site (SRS).…
This EEC covers various general renovations for Building 735-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…