The project modifies Savannah River National Lab 773-A B
The purpose of this Temporary Modification is to install a temporary air supply via portable air compressors by way of a tie-in with the DWPF Plant…
The environmental drilling contractor will install 28 multi-screened nested monitoring wells at 10 boreholes to further define the volatile organic…
The scope of this activity is aimed at refurbishing Platinum Silicon Carbide (PtSiC) open cell foam through hydrogen reduction.…
This EEC is for instruments designated as Gas Chromatograph / Mass Spectrometers (GC/MS) that are used in the Analytical Development Section (ADS) …
SRNL will perform a RCRA treatability study to verify the glycolate destruction model using DWPF samples from the Recycle Collection Tank (RCT).…
To install permanent covers for the 735-22A Cylinder Storage Area for the hydrogen and propane gas delivery systems.…
Remote interlock is to be added to the Salt Solution Receipt Tank Process Vessel Vent Heater Controller.…
Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…