Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Paint Trailer Space Door Exterior and Entrance (Pavement) Area…
Repair Drywall at 730-2B.…
Perform Containment Modifications at 780-2A.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
The existing 12V Group 8D Interstate batteries (Part No. 8D-MHD) will be replaced with a 12V Trojan Battery Group 8D-AGM Dual Purpose (Part No. Mot…
Remove/Replace Flooring at Ballistic Resistance Enclosure No. 1 in Assembly with Safety Zone flooring.…
Operations and Maintenance Plan 24-001 describes the excavation of a known soil "hot spot" slightly above background levels containing cesium-137 l…
This is an "After-the-fact" EEC for stream monitors that were installed in 2020. Monitor stream discharge to investigate whether appropriate size b…
Initial investigation indicates that the compression fitting on the downstream side of HOOD-055 V-008 is leaking and requires repair and PROP-V-021…