The activity is to replace the 151-1K DC breaker panel due to age and normal wear over time.…
Install flow meter, solar panel, sampler, and sensor in culvert after the E-3 basin. Equipment will help measure water discharged from E-3 basin an…
Several wall panels (interior and exterior) on the D-wing of building 773-A have deteriorated and cracked due to age and normal wear and tear. Asbe…
This EEC covers various general renovations for Building 773-A A-wing in non-radiological areas. Scope includes D and R such as replacing refrigera…
This EEC supports activities post Cold and Dark status of Building 235-F.…
Remove space heaters from service.…
Remove Abandoned Unloading and Conveying System (UNLD) associated piping and pipe supports to allow personnel access to the safety shower at Bldg. …
703-46A and 703-41A Modification to entry gate at 703-46A and 703-41A.…
Subcontractor to provide all means, labor, supervision, quality control and materials to reconfigure circuit panel 22 and 3.…
Subcontractor will provide roof repairs at 707-C. The Subcontractor "will not" disturb the existing roof while performing these repairs on 707-C.…