Relocate and demolish trailers 706-19C and 706-21C.…
Operation of two (2) water jets in Building 221-33F.…
Relocate and demolish trailers 773-69A and 773-70A. (Revision 1)…
There are 31 cylinders in 731-6N that bear expired DOT permit marks (denoted by DOT-SP or DOT-E) that have been disallowed for shipment back to Nex…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
The researcher will release headstarted gopher frogs at three sites and compare survival under different release and vegetative restoration methods…
Remove wall and install a security door in 713-N. Relocate Shelving Units and Fence Removal/Installation at 713-N.…
This EEC covers work done to assemble gas transfer systems in the High Pressure Laboratory by Gas transfer systems technology group (GTSTG) personn…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
Evaluate and Correct Process Well 905-119H. Repair/Replace Process Well Water Piping, Air Trap, and Valves.…