Repair Wall Damage Under Window in 773-65A Room 12.…
The purpose of this EEC is to document the property transfer of three mockup test gloveboxes for SRPPF that are finishing fire suppression testing.…
Perform preventative maintenance and repair loose fill in cooling tower.…
The existing Programable Logic Controller (PLC) is old and a newer upgraded PLC is needed.…
Trailer 704-39Z is currently be supplied power by a portable diesel generator. It will be switched over to permanent power as it will be housing em…
Replace Unit No. 1 10 ton HVAC.…
Paint R Area wells RRP 6D and RRP 7D.…
Install Wi-Fi in Trailer 704-46Z…
Geotechnical Engineering Group will be taking bore samples of soil at the Burma Road Borrow Pit…
Provide services to refurbish the hot water basin, cold water basin and fill sections of the 218-2H cooling tower cells.…