Rainwater has entered C-Area and collected in sump 216-C. Due to the nature of the former processes in C-Area the water is anticipated to be tritia…
Install UW drops for cubicle replacement in 703-43A.…
C. E. Bourne Subcontractor will provide roof repairs at 701-2L. The Subcontractor will not disturb the existing roof while performing these repairs…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…
This activity will assess the use of specialized test kits for measurement of hexavalent chromium and to determine detection limits that can be ach…
The 786-5A Trailer is an older structure (Occupied) and needs all the windows repaired from water intrusion by leaking windows. Additional building…
Demolish and remove (D and R) 719-H South (front) and West (side) exterior double doors, frames (if needed), and lock assemblies.…
This project aims to design and construct a working water vapor detritiation unit for the passive for example, ambient condition) recovery of accum…
Disassemble, sort, and dispose of legacy RAD equipment located at the Salvage Yard.…