The HMI ("Signal" software running on Windows 7 PC) for the HVAC system at the 2H control room building is obsolete and unreliable. This HMI platfo…
Revision 4: Additional scope of approximately 930 LF of 6" diameter Fire Water line and 4 new Fire Hydrants, tied into existing Fire Water system. …
SREL is creating a new laboratory space in building 737-18A to be used for radiological research.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
A new Isolator Inert Glovebox (GB) and supporting gas services are to be installed in Building 723-15A, Metal Printing Laboratory. It will be used …
Activity involves collecting water samples from groundwater wells and surface water stations at the F-Area Seepage Basins and its associated wetlan…
Relocate Delta V servers from 248-H to 264-H.…
The 3D printing Stratasys F120 machine builds plastic pieces from a 3D CAD file. If supports are needed for the model material as it is being built…
Study will quantify levels of contaminants in birds utilizing habitat within and surrounding Fourmile Branch and HP-52.…
The K-Area Protected Area Entry Control Facility-3 (ECF) Support Diesel Generator/Pad, etc. will be protected from casual entry via an installed fe…