SRTE will vent cylinder containing 50 percent Helium and 50 percent Carbon Dioxide (Cylinder
The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
The U.S. Department of Energy (DOE) is proposing to provide funding to Mojave Energy Systems, Inc. (Mojave) to design, develop, fabricate, and fiel…
The DynaCool Physical property measurement system (PPMS) employs a minimum amount of condensed liquid Helium-4 for cooling both the sample chamber …
999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
Upgrade men's and women's locker rooms in 704-K. Revision 1 is specific to the replacement of existing vinyl sheet flooring and extending work dura…
Replace Lift Station Pumps at 607-44H.…
Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…