A new container loading system (CLS) will be installed on TRU Pad 4.…
The Mobile Melt Consolidation (MMC) Project components will be installed at 645-N.…
The objective of this task is to measure the retention of mono-methylmercury (MM) in Saltstone cementitious grout under saturated leaching conditio…
This EEC covers various renovation activities for Building 703-41A.…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
784-7A Boiler No. 2 Retubing.…
Caulking to be removed and replaced with non-asbestos caulking.…
Advanced Tactical Training Academy (ATTA) or Bobby Davis Range (BDR) changed from 40 caliber (.40 cal) to 9 -millimeter (9 mm).…
Windows in 704-L need caulking. Asbestos is present in the existing window glazing material, therefore the caulk will be added with plans not to di…
The current Instrument Air (IA) High Density Polyethylene (HDPE) Poly-flo tubing is sagging alongside the northeast end of building 234-H and has p…