Installation of VTC in 730-1B Rm. 329.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Refurbish Office Trailers 742-G through 742-5G.…
The Soil Vapor Extraction Unit (SVEU) at A-Area Burning Rubble Pit has been abandoned in place. The SVEU has been disconnected electrically and mec…
Fuel-cell style membranes will be used to evaluate hydrogen isotope separations. Hydrogen/deuterium (pure or mixtures) will flow on one side of the…
The purpose of this project is to test coal ash obtained from SRS for leachability with the end goal being potential beneficial reuse.…
On Thursday, October 12, Centerra-SRS will conduct a security exercise resulting in a downed aircraft.…
This task is to identify alternative cleaning agents to Vertrel MCA. Vetrel MCA is being removed from the market due to EPA regulations. This task …
Modify Plant Airline and install equipment in 717-F machine shop. Rev.1 added to excess removed equipment and other equipment.…
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra - SRS are as realistic as possible and conducted in a safe manner. CFo…