This EEC will cover work associated with the replacement of the cipher lock on fire door 312 in 221-H room 308 and the crash bar if necessary.…
The EEC covers the renovations to the interior of building 711-9N.…
The objective of this work is to prepare samples for iodine speciation in environmental samples by testing for iodide, iodate, and organo-iodine co…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system.…
Remove/Replace Flooring in 711-1K Fitness Room…
CM 4281-Remove Split Unit on West Side of Bldg 713-1N.…
Removal of Modular Panels and replace carpet in 703-43A.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site. Revision 4 include…
703-46A Wifi Installation.…
Install 2 mini mobiles in the NW 703-A Parking lot.…