The 50-ohm resistance thermal device (RTD) for 6.2F will be replaced with a 100-ohm platinum (Pt) RTD. The associated recorder shall be reprogramme…
Removal of electrical to door 313 and 320 in 105-L and door 313 to be removed from building.…
A more suitable location to gauge field parameters at station L3R1-A was identified. The following activities will take place to establish the new …
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra-SRS are as realistic as possible and conducted in a safe manner.…
This EEC addresses three general activities associated with the remediation of the Lower Three Runs (LTR) Integrator Operable Unit (IOU): 1) Sedime…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201. Replace the steam and chill water coils in t…
Replace defective Vessel Vent System duct heater and control panel in building 776-4A. VVS duct heater to be removed will contain internal radioact…
Subcontractor Thomson Roofing will perform a roof replacement on 714-N.…
Maintenance will remove/replace Tank 181 East and West strainer to inspect for blockages and clean.…
Sputter deposition is a physical vapor deposition method of depositing thin films on substrates. This EEC cover the activities for the preparation …