Repair and coat the chemical containment dikes in 782-3A. Revision 1 is necessary to include the rerouting of power and signal cables for the scope…
Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin…
The purpose of this project is to synthesize getters from bismuth and zinc salts, which can then be used to test their iodine sequestration capabil…
731-1N Break Room Remodel Room No. 101.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Building 714-7N minor modifications to support K-Area missions and additional storage needs.…
192-2K Fire Water System Jockey Pump Controller Replacement (Electric and Diesel).…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 17), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Repair Wall Damage Under Window in 773-65A Room 12.…
The purpose of this EEC is to document the property transfer of three mockup test gloveboxes for SRPPF that are finishing fire suppression testing.…