Replace the existing Cold Feed Chemical Systems Caustic Transfer Pump (422-010-031-00-P), system NAK with a state-of-the-art transfer pump since th…
Move existing air station off of private property to onsite location. Install power at pole: R22 1344G, and move air station from existing site to …
The EEC covers refurbishing aboveground fuel tanks 619-2N, 619-4N and 715-3N.…
Install Sample Tap Modifications to 782-A Service Water Header.…
Correct Drainage Issues at 719-5N.…
Terminal Engineering and Manufacturing (TEM), was selected to design an almost like-for-like diffuser to replace the old JMIs diffusers during fail…
It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 234-H Tritium Air Monitoring system.…
Installation of a walking/cart path in-between 704-J and 221-J and another walking/cart path south and west of 704-J to an installation of a rad co…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…