The Activity proposed by this EEC is the disposal of routine solid Low-Level Waste (LLW) and Transuranic (TRU) waste generated by performance of An…
The scope of this work is to Install a partition wall around the old communication rack at the South end of the 221-H control room.…
Remove Valve V-061 To Isolate Old Abandoned Well Water Header.…
Paint building exterior at 251-H.…
Install approximately 50 new poles and overhead fiber to Dominion Energy Substation 504-5G. Cable will be run on new poles installed within the exi…
Laboratory 141 and 193 of the 999-2W facility will be used to perform general chemical and nanomaterials research support for a variety of DOE-rela…
This project studies ongoing uranium transport in Tims Branch to aid in future clean up.…
Install new HVAC unit for Men and Women locker rooms/restrooms at 705-N. This includes installing new concrete, duct work, insulation, packaged air…
During a housekeeping walkdown it was observed that the walls, doors, and handrails at the North Dock need to be repainted.…
This EEC is for the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly and RVV No. 2 dampers in H-Canyon Building 292-H per MT-HCA-2021-000…