A new "commodities center" warehouse (and parking area) will be installed in K-Area in support of the K-Interim Surveillance (KIS), Surplus Plutoni…
The HANM Gas Blend turbo pump and controller will be replaced per design change package.…
This EEC covers various routine maintenance activities that occur in the Savannah River Tritium Enterprise (SRTE) Limited Area.…
Subcontractor will perform roof repairs on 773-41A. The Subcontractor will not disturb the existing roof on 773-41A.…
SRNL and the University of Florida will experiment with non-irradiated Al-clad uranium fuel surrogates and uranium silicide fuel to determine the c…
Replace light fixtures with LEDs at 717-10N/711-9N/711-N, 711-1N, and 711-2N. Replace 1 electrical wall heater in 711-9N and 5 electrical wall heat…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
K-Area Trailers Repair…
Seal coat and restripe the parking lot at 705-A.…
Mk-18A Equipment Qualification/Shipment Preparedness…