Paint that is bubbling on the exterior of building 701-1L will be removed and those areas will be repainted.…
Fabricate and Install Disassembly Basin Weir Plates…
Sidewalks are to be installed for Ice Plant routine access areas, East of 234-7H.…
730-2B Remodel hallways.…
Four additional monitoring wells will be installed at the Northern Sector of the M-Area Hazardous Waste Management Facility, as a condition of the …
The U.S. Department of Energy (DOE) is proposing to provide funding to the Electric Power Research Institute (EPRI) to evaluate the suitability of …
Create various matrices of liquids and residues to support the Mark-18A program, SRPPF, SRS facilities, and fundamental research…
This EEC covers analytical methods for Radiochemical Measurements. Rev 6: Adding additional chemicals to existing projects…
Perform office renovations in 704-L…
Activities to troubleshoot, repair and/or replace light fixtures in non-radiological areas of L-area.…