Cooling Oasis with Installed Fire Protection in 163-70K.…
Savannah River Nuclear Solutions (SRNS) Fleet and Fuel Operations to replace the existing FCT (fuel control terminal) system.…
To install permanent covers for the 735-22A Cylinder Storage Area for the hydrogen and propane gas delivery systems.…
Road E (2.5 miles) will be milled 2-1/2 in, paved with 1 in Open Graded Interlayer (OGI) and 2 in of asphalt, striped with thermoplastic and edge o…
H canyon is sending Savannah River National Laboratory (SRNL) insoluble solids from an electrolytic dissolver. SRNL is to analyze these solids. Ana…
731-N Power wash and paint.…
Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin.…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
This EEC will cover general renovation activities in 735-2A.…
Radiological Protection (RP) has identified a curb on second level where contamination is leaching out of the concrete creating an Airborne Radioac…