The TEF Remote Handling Area (RHA) Crane has a scenario where radioactive material is being handled by the crane and a failure causes the inability…
Open Glovebox Maintenance (OGM) to replace multiple valves in GB-5. Rev. 1 created to extend activity end date, updated EEC to new version of EEC…
Install Unistrut to wall in Building 707-C Room 356 that will be used to securely mount a gun rack system.…
Construction to upgrade VTC in 730-1B (Room 344).…
Replace 2 sets of wooden stairs at 704-16B with aluminum.…
Installation of Wi-Fi in 708-1B.…
Paint office 43 at 703-43A.…
With the developing construction of the Surplus Plutonium Disposition (SPD) Project, two fabric tension structures (Quonset hut), enclosure fencing…
Portions of the SRTE and H-Area process sewer will be flushed to the H-12 outfall as a facility maintenance activity to determine the source of the…
Testing of radioactive salt batches with dead-end filters under different conditions in order to characterize the precipitates and examine the impa…