Replace 248-H Wet Chemical Agent Cylinder due to Age…
Permeation testing of metal, ceramic, and polymer samples with hydrogen, deuterium, helium, argon, carbon monoxide, carbon dioxide, and nitrogen wi…
The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop a high-performance cat…
The Auger Spectrophotometer is a non-destructive technique used to analyze metal samples.…
Daily operation of microscopy and spectroscopy instruments in 735-A, D-137.…
This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
The failed roofing systems on the Assembly/910/911 roofs of 105-L will be demolished and replaced. This will prevent the numerous leaks that curren…
Pole K1225 needs to be replaced, and pole 37 needs repairs.…
The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…
Fabricate and Install Replacement Trash Racks at 681-3G River Pump House.…