5 various pieces of equipment are being excessed via established SRS protocol.…
DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
Subcontractor will perform repairs to the roof on Bldg. 773-A.…
To design and install new replacements for aging fire panels in K-Area Materials Storage Building.…
A method of venting the pumps between the suction side of the pump and the back pressure regulator will be installed.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of Par Pond Dam.…
The F/HAL Instrument Air Compressor (IAC) No. 3 heat exchanger failed during extreme cold in early January.…
730-B LED Light installation.…
Repairs/refurbishments shall be made to the basins to correct existing leaks, arrest existing corrosion, and minimize future corrosion of basin sur…