Renovate the 751-1A Men's restroom, offices, kitchen, and hallway. Replace flooring in the kitchen.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 100…
There are 31 cylinders in 731-6N that bear expired DOT permit marks (denoted by DOT-SP or DOT-E) that have been disallowed for shipment back to Nex…
AM and DO Warehouse Personnel will use a floor scrubber to clean the floors of the warehouses at 731-1N, 731-2N, 731-3N, 731-4N, 731-5N, 713-1N, 71…
Refurbish the 105-L 15 Womens and Mens Restrooms and Refurbish 105-L level 0 Women's and Men's Restrooms and Women's Restrooms.…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors and potential implementation of Te…
Redesign and replace the stripper system regeneration piping to reduce/eliminate low points.…
The proposed work scope includes tasks to evaluate and repair the cause of damaged bolts on the CAEX No. 1 system in Building 292-F.…
Two Quonset Huts are to be installed in Z-Area to support construction activities.…
The Proposed Activity is for E-DCF-H-09750 to add an extension to the ARM-8 detector in 264-2H Cask Receiving.…