The Plant Air System (PRA) is used to support the dry material silos.…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
Remove wall and install a security door in 713-N.…
Apply fire retardant coating FireFree88 (SDS No. 43617-1) to butcher block desks/benches/rolling toolboxes as specified by approved applicable work…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
The laser system for the Function Test Station (FTS) is beyond it's service life and needs to be replaced.…
Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
Remove existing air station off of private property and install a new air station at the old Williston barricade.…
An electrical resistance tomography (ERT) system (a geophysical method) will be tested on the low permeability geosynthetic cap over the closed Tre…