The researcher will release headstarted gopher frogs at three sites and compare survival under different release and vegetative restoration methods…
Remove wall and install a security door in 713-N. Relocate Shelving Units and Fence Removal/Installation at 713-N.…
This EEC covers work done to assemble gas transfer systems in the High Pressure Laboratory by Gas transfer systems technology group (GTSTG) personn…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
Evaluate and Correct Process Well 905-119H. Repair/Replace Process Well Water Piping, Air Trap, and Valves.…
Subcontractor Thomson Roofing will perform a roof replacement on 707-F. The Subcontractor "will" disturb the existing roof on 707-F.…
Replace sidewalk section near 722-A.…
Pump Out Waterjet Tank in 773-50A.…
Relocate and demolish trailers 719-1N and 719-4N (Revision 2).…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of Par Pond Dam. Eleven (1…