This EEC is to cover changing generator SRO5579 to a RICE unit.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitor's parts in the Tritium Extraction F…
Security Subnode Cabinets and other enclosures installed under Project Y738 do not match the standardized design adopted by latest Tritium security…
Relocate and demolish trailer 704-15B.…
Relocate and Demolish Trailers 760-22G and 760-23G. (Revision 1)…
Relocate and demolish trailers 706-19C and 706-21C.…
Operation of two (2) water jets in Building 221-33F.…
Relocate and demolish trailers 773-69A and 773-70A. (Revision 1)…
There are 31 cylinders in 731-6N that bear expired DOT permit marks (denoted by DOT-SP or DOT-E) that have been disallowed for shipment back to Nex…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…