The Saltstone Bulk Material Handling (BMH) system is experiencing equipment issues associated with corrosion/deterioration and life expectancy.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry method in 773…
703-43A Room 30 Install electrical and UW (Universal Wiring) to cubicles.…
SRMC plans to set up a Clemco Wet Blast Injector system adjacent to the Z-Area construction fabrication area to support work throughout SRMC.…
Repairing holes in sheetrock and painting the offices…
The Environmental Monitoring Group collects samples throughout the year to analyze for radiological and non-radiological constituents. After they a…
Revision 0: The Savannah River Site will replace recovery well RWM-1 with a new recovery well, RWM-001-R, due to a decrease in the groundwater flow…
Installation of two automated overhead switches and an IntelliNode device to self-heal the network in case of a circuit-level power outage.…
Installation of 47 GOABs throughout the electric system and installation of a line monitoring system.…
Isolation of Steam Facilities east of F-Canyon.…