Subcontractor will perform a roof repairs on 226-2F. The Subcontractor will not disturb the existing roof on 226-2F.…
Replace of the concrete expansion/construction joints.…
Subcontractor will perform a roof repairs on 704-74F. The Subcontractor will not disturb the existing roof on 704-74F.…
Project Y236 has authorized that 236-H be demolished and removed. Refer to V-PMP-H-00039, "Decommissioning End Points Document Building 236-H, By-P…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Paint walls, doors, and trim in room 5 at 284-7H.…
Subcontractor will repair the roof at 773-42A. The Subcontractor will not disturb the existing roof on 773-42A.…
Move the 681-3G transformers without oil to 681-1G (retired) pumphouse for ultimate disposition by the CRO. The 681-1G transformers are currently s…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…