Replace of the concrete expansion/construction joints.…
Subcontractor will perform a roof repairs on 704-74F. The Subcontractor will not disturb the existing roof on 704-74F.…
Project Y236 has authorized that 236-H be demolished and removed. Refer to V-PMP-H-00039, "Decommissioning End Points Document Building 236-H, By-P…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Paint walls, doors, and trim in room 5 at 284-7H.…
Subcontractor will repair the roof at 773-42A. The Subcontractor will not disturb the existing roof on 773-42A.…
Move the 681-3G transformers without oil to 681-1G (retired) pumphouse for ultimate disposition by the CRO. The 681-1G transformers are currently s…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…