The scope of this work is to remove and replace the rusted roof panels on the CWR basin.…
Repair door trim hardware in sample aisles on 3rd level in both hot and warm canyon.…
Replace Dog Kennel Fence Post at 703-10B.…
Repair/Replace 4 feet x 6 inches Wooden platform and ladder.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
K-Area Compressed Air System Modification.…
The proposed activity (PA) is the design, review, and implementation of Temporary Modification (TMOD) M-TMOD-Z-00007. The process vessel ventilatio…
Removal of electrically D and R'd HVAC FAN unit and related conduits and ductwork on 234-H Roof near CL AA. Place cover on existing Duct Opening (2…
Open Glovebox Maintenance (OGM) to replace multiple valves in GB-500…
1.35 miles of underground fiber installed in microduct within 4 inch HDPE conduit in existing Cooperative ROW. 1.49 miles of underground fiber ins…